A single step between the pavement and a shop can prevent a wheelchair user from entering and make access difficult for someone using a walking frame. A ramp may fit inside the premises, but it needs more space than its sloping section alone. The doorway, landings and room to turn often determine whether it is feasible.

Before leasing or renovating a unit, assess the entrance alongside the layout. This guide helps with an initial assessment; the final design requires a measured survey and technical justification. Official sources consulted: 5 November 2026.

What to measure before removing the entrance step

An accessible route is a route that meets the applicable requirements for safe, independent movement. It does not end at the entrance door.

  • Total rise: the vertical difference between the pavement and the finished internal floor. Measure at several points if the street slopes, and include thresholds and any planned increase in floor height.
  • Available length and width: measure between finished surfaces and locate columns, shop windows, radiators, furniture and projections.
  • Doorway: measure the actual clear opening, not just the door leaf. Record the opening direction, handles, opening force and door swing: the area occupied as the door opens.
  • Landings and turns: identify where users can stop, open and close the door, and change direction. A landing is a resting area between ramp sections or at their ends.
  • Crossfall: the sideways slope, distinct from the gradient along the direction of travel. Check both, including the junction with the pavement.
  • Construction: establish what lies beneath the floor: fill, the structural floor, a basement, pipes or waterproofing.
  • Boundaries and records: identify shared building elements, the façade, public land, heritage protection and the documentation for the authorised business activity.

Record missing information as “Not specified”. Do not assume that all the material beneath the tiles can be removed.

How to calculate ramp length

The initial calculation is horizontal length = rise / gradient expressed as a decimal. An 8% gradient equals 0.08: eight centimetres of rise for each horizontal metre. It does not mean eight degrees.

Use consistent units. If you enter the rise in metres, the result will be in metres. This gives the horizontal length of the sloping section, excluding landings and manoeuvring space.

Indicative examples of the space required

Geometric calculations: these do not establish accessibility compliance
Rise Proposed gradient Calculation Horizontal ramp length
10 cm 10% 0.10 m / 0.10 1.00 m
15 cm 8% 0.15 m / 0.08 1.875 m
20 cm 8% 0.20 m / 0.08 2.50 m
30 cm 8% 0.30 m / 0.08 3.75 m

The 1.875 m result can be expressed as approximately 1.88 m for an initial assessment. The design must specify the actual construction dimensions.

As a general reference, DB-SUA, the safety and accessibility document within Spain’s Technical Building Code (CTE), sets maximum gradients for ramps on accessible routes of 10% for sections shorter than 3 m; 8% for sections from 3 m to less than 6 m; and 6% in the remaining cases.

Therefore, 0.30 m / 0.10 = 3 m is mathematically correct, but does not meet the general condition allowing 10% only for sections shorter than 3 m. There is no single maximum gradient suitable for every accessible ramp: length, use, the proposed work and applicable regulations must all be checked.

The space often overlooked: doors, width and landings

Under the general provisions of DB-SUA, sections SUA 1-4.3.2 and 4.3.3, ramps on accessible routes require a minimum width of 1.20 m and horizontal areas at each end measuring at least 1.20 m along the direction of travel. Landings between sections continuing in the same direction require 1.50 m. A 1.50 m separation is also specified in relation to doors and certain corridors. Maximum crossfall is 2%.

These dimensions must be considered together. Simply adding two 1.20 m landings is not enough: the door and its swing may require additional space. Adaptations in existing buildings require a separate assessment.

For example, a 2.50 m ramp with a 1.50 m entrance area and a 1.20 m upper landing would occupy 5.20 m in a straight line. This is a layout assumption, not an approved design.

Slip resistance, handrails and edge protection where required, lighting and escape routes also need checking. Changing the ramp’s direction may make better use of the layout, but requires a suitable landing and sufficient width.

Which solutions should you compare?

A permanent ramp entirely inside the premises

This integrates access into the layout and avoids works to the pavement. It takes up commercial floor space and may require moving the entrance door further inside. Where the internal floor is higher, the entrance area will normally need lowering: adding a wedge on top of the existing floor does not, by itself, remove the step outside.

Lowering or altering the internal floor

This may reduce the rise or create an entrance at pavement level. The structure, drainage, moisture protection and available floor depth must be assessed. Lowering only a small area can simply move the barrier further inside.

A platform lift or another accessibility aid

A vertical platform lift may be considered where a permanent ramp or passenger lift is not feasible. It needs approach and exit space, an electrical supply and maintenance. It must not obstruct escape routes. A seated stairlift is not equivalent to a wheelchair platform lift and is not a general alternative for public use.

Altering the threshold, façade or pavement

The threshold is the junction between the bottom of the doorway and the floor. Alterations may affect the door assembly, waterproofing or protected features. Works to the pavement require municipal assessment and authorisation: improving a private entrance must not create an obstacle for pedestrians.

Portable or temporary ramps

Their usefulness depends on positioning, stability, gradient and the availability of assistance. They may occupy the pavement or interfere with opening the door. Do not assume they are acceptable as a permanent solution merely because they bridge the step. Any alternative proposal needs technical justification and administrative verification.

Accessibility regulations for commercial premises in Madrid

Several regulatory levels apply, depending on the building and the proposed work. These are Spanish and Madrid requirements:

  • National: the CTE, particularly DB-SUA, together with the escape requirements in DB-SI, its fire safety document. DA DB-SUA/2 provides guidance on adapting existing buildings; it is a supporting document, not a blanket exemption.
  • Regional: Community of Madrid Law 8/1993 and Decree 13/2007, as amended. Municipal Instruction 1/2017 confirms the application of the regional regulation to matters not expressly covered by DB-SUA.
  • Municipal: Instruction 1/2017, listed in Madrid City Council’s register of instructions in force, and Ordinance 6/2022 on urban planning licences and responsible declarations. Planning rules and the building’s protection status must also be checked.
  • Public space: Order TMA/851/2021 is also relevant, within its scope, if the pavement is affected.

For existing premises, reasonable adjustments are effective adaptations that do not impose a disproportionate burden. If full compliance is not feasible, this must be justified. A steeper ramp cannot simply be chosen because it suits the business layout.

A renovation, change of use or change of business activity requires assessment of its specific scope; an old licence does not provide an automatic exemption. In protected buildings, accessibility and conservation must be reconciled under Law 8/2023 and the applicable protection regime. Where requirements overlap, the competent professional must justify the approach and confirm it with the City Council.

What permissions and checks might be needed?

  • Municipal procedure: establish whether the work requires a licence or a declaración responsable, a formal declaration of compliance, and which technical documents are needed. Filing a declaration does not make a non-compliant design lawful.
  • Ownership and the owners’ association: if you are a tenant, review the lease and required consents. Alterations affecting the façade, structure or other shared elements require assessment under Spain’s horizontal property rules.
  • Heritage: check the building’s listing, protected features and any required reports or authorisations.
  • Public space: distinguish approval for changes to the entrance from temporary occupation permissions for works, skips or equipment.

Initial assessment checklist

  • I have measured the rise and clear space, allowing for the proposed finishes.
  • I have calculated the ramp length and checked the corresponding gradient limit.
  • I have drawn the door, its swing, landings, turns and obstacles.
  • I have identified possible effects on the structure and building services.
  • I have reviewed ownership, protection status and the required procedure.
  • I have checked the continuous route to customer areas and facilities that must be accessible.

If the toilet layout also needs attention, see our guide to accessible toilets in small commercial premises.

Five frequently asked questions

How much space does a ramp for a 20 cm step need?

At an 8% gradient, the sloping section requires 2.50 m horizontally. Landings, the door and manoeuvring space are additional considerations; that figure alone does not establish whether it fits.

Can I make the ramp steeper if space is limited?

Not simply by choice. Any permitted tolerances for existing buildings require a regulatory basis and technical justification.

Can a portable ramp avoid the need for building work?

It may provide occasional assistance, but does not by itself demonstrate permanent, independent access that complies with the regulations.

Do I need permission if the ramp is entirely indoors?

The applicable procedure must be checked against the scope of work. An indoor location does not rule out structural, shared-property or heritage implications.

Are small commercial premises exempt from accessibility requirements?

Not automatically. Floor area may influence the feasibility assessment, but alternatives and applicable obligations still need to be examined.

So, will a ramp fit inside?

It may, but comparing the rise with the available length is not enough. Gradient, width, landings, the door, manoeuvring space, construction and regulations must be assessed together.

At Maceta y Cortafrío, we incorporate these checks into the planning of commercial premises renovations in Madrid. Request a measured survey and technical assessment of your entrance before starting work. Photographs, the address and the intended use will help us establish what needs reviewing, without assuming that a particular solution will receive approval.