To check whether an accessible toilet will fit in small commercial premises in Madrid, you need to assess the entire access route and the layout of the fittings, not just the room’s floor area. A space that looks generous can still fall short because of a doorway, a column or insufficient clearance beside the toilet.

This guide helps owners, tenants and business operators spot potential constraints before renovating. It is a preliminary assessment, not a substitute for the required technical design, documentation or confirmation from the relevant council. Official sources consulted: 24 October 2026. The guidance concerns Spanish regulations applicable in Madrid.

1. Why measuring the toilet room alone is not enough

An accessible route is a route that meets the applicable requirements for people to move around and use spaces independently and safely. Assess it from the entrance to the premises all the way to the toilet, including level changes, corridors, doors and changes of direction.

Inside the room, distinguish between turning space, which allows someone to change direction; approach space, which allows them to reach a fitting; and transfer space, which allows someone to move between a wheelchair and the toilet seat. A radiator, waste bin or washbasin can obstruct these movements even when the total floor area seems sufficient.

2. What to gather before you start measuring

  • An up-to-date plan and photographs: compare the plan with the actual layout and any existing licence or business activity documentation.
  • The proposed use and maximum occupancy: clarify whether the toilet will serve customers, staff or both.
  • Property details: address, floor level, building age, heritage protection and any shared building elements that could be affected.
  • The existing condition and proposed work: opening a business, changing the activity or use, partial refurbishment or a new layout.
  • Structure and services: columns, possible load-bearing walls, drainage stacks—vertical wastewater pipes—ventilation and service connections.
  • The access route: level changes and clear widths at the entrance, along corridors and through doors.

Mark anything unknown as “Not specified”. Do not assume that a wall can be demolished or a drainage stack relocated.

3. A step-by-step method for checking whether it will fit

Step 1. Measure the actual usable space

Measure between finished surfaces at several points. Record projections, boxed-in services and corners that are not square. If you measure before tiling or lining the walls, allow for the proposed finishes. The advertised built area includes elements that cannot be used for manoeuvring.

Step 2. Draw a simple plan to scale

A scale of 1:20 is useful: one metre on site becomes five centimetres on paper. Draw walls, openings and obstacles, then add written dimensions. This is a practical checking tool, not a technical drawing suitable for an administrative submission.

Step 3. Show doors and their opening arcs

The door swing is the area swept by the door leaf as it opens. Check the effective clear opening, rather than the door’s nominal size, and the space needed to operate it from both sides. An outward-opening door must also be checked for conflicts with the corridor.

Step 4. Check turning, approach and transfer spaces

As general reference requirements in Annex A of Spain’s CTE DB-SUA, an accessible toilet includes:

  • An unobstructed turning circle measuring 1.50 m in diameter.
  • Lateral transfer space beside the toilet measuring at least 80 cm wide, with a depth of at least 75 cm to the toilet’s front edge; for public use, transfer space is required on both sides.
  • A door that meets the accessible-route requirements and opens outwards or slides.

For that route, Annex A generally specifies 1.20 m-wide corridors and a clear door opening of 0.80 m measured at the frame, allowing 0.78 m where the fully opened door leaf reduces the opening. It also requires level manoeuvring spaces measuring 1.20 m in diameter on both sides of doors, clear of their swing. These references are not a complete specification and do not replace the assessment applicable to an existing building.

Use paper templates to visualise the movements. Do not assume that any overlap between manoeuvring spaces and fittings is acceptable.

Step 5. Position the toilet, basin, grab rails and accessories

Use the technical information for the actual products proposed: toilet width and projection, basin projection, cistern and grab rails in both folded and lowered positions. Check the approach to the basin and the space underneath it, without cabinets blocking access.

Norma 6 of the Community of Madrid’s Decreto 13/2007 regulates adapted toilet facilities, including clear spaces, fittings, an assistance call system and emergency unlocking from outside. Article 12 refers to Norma 10 for the required provision of facilities. The designer must assess these provisions alongside the CTE; adding grab rails alone does not make a toilet accessible.

Step 6. Follow the route from the entrance

Walk through the premises with your sketch and check every narrow point. Include proposed displays, counters and furniture. A step at the entrance or an unmanageable turn may affect feasibility even if the toilet room itself appears to work.

Step 7. Identify obstacles requiring further investigation

Mark columns, walls, service shafts—vertical enclosures containing building services—inspection points and pipes. Consider how drainage and ventilation could be provided without creating new level changes. Distinguish between moving furniture and altering the structure or shared services.

4. Common mistakes when checking accessible toilet dimensions

  • Measuring wall to wall without allowing for new finishes.
  • Letting a door obstruct the required manoeuvring space.
  • Confusing a spacious toilet room with a legally compliant accessible toilet.
  • Allowing room for the toilet fitting but not for someone to use it.
  • Forgetting accessories, grab rails, waste bins or cleaning cupboards.
  • Copying another business’s layout without checking the use, occupancy and proposed work.
  • Assuming that all existing premises face identical requirements or that small premises are automatically exempt.

5. Worked example: using a scale sketch to identify a problem

Imagine a room with finished internal dimensions of 1.60 × 2.20 m. These hypothetical measurements illustrate the checking method. They are not minimum room dimensions or a universally suitable layout.

  • At 1:20 scale, draw a rectangle measuring 8 × 11 cm.
  • Draw a hypothetical toilet fitting 40 cm wide: it occupies 2 cm on the sketch.
  • If centred, it leaves 60 cm on each side: (160 − 40) ÷ 2. The sketch shows that this falls short of the general side-transfer clearances described above for public use.
  • Add a circular template 7.5 cm in diameter, representing the 1.50 m turning circle, plus the basin footprint and door swing.

Even if the circle fits inside the empty rectangle, it may clash with the fittings. The preliminary outcome is “layout changes required”. If enlarging the room involves structural or protected elements, the outcome becomes “detailed technical assessment needed”.

6. Feasibility checklist: three possible outcomes

  • Appears feasible: the route, doors, fittings and spaces for use are shown without obvious conflicts. Arrange a professional check; this outcome does not demonstrate compliance.
  • Layout changes required: there are clashes that might be resolved by repositioning partitions, the door or furniture. Draw an alternative and check the entire route again.
  • Detailed technical assessment needed: information is missing; structure, heritage protection, level changes or services constrain the design; or the proposal relies on accepting conditions different from the general requirements.

If more than one outcome applies, choose the one requiring the more detailed assessment.

7. Alternatives a professional may investigate

Options may include extending into a storeroom, relocating the toilet, changing its entrance, selecting appropriately shaped fittings or reorganising the toilet facilities where the rules governing the business allow it.

For existing buildings, DA DB-SUA/2 provides guidance on improving accessibility where the general requirements cannot be achieved. It is a supporting document: its tolerances are not automatic exemptions and do not override other regulations. The constraints and proposed solution require technical justification.

This assessment should form part of planning a commercial premises renovation in Madrid. If the business activity is changing, also review the issues involved in adapting commercial premises to a new use.

8. When to consult a qualified professional and the council

Before finalising the layout or commissioning the work, consult an architect, a Spanish arquitecto técnico (a regulated building professional), or another appropriately qualified professional for the work concerned. Professional involvement is essential where compliance must be justified, technical documentation prepared or structural elements, access arrangements or critical services altered.

The applicable requirements depend on the use, occupancy, who will use the toilet, the existing building and the scope of intervention. Ley 8/1993 and Decreto 13/2007 form part of the regional framework. Within Madrid city, Ordenanza 6/2022 governs the urban-planning procedures. Using a declaración responsable—a formal declaration of compliance—does not remove the technical obligations.

Gather your sketch, photographs and existing documentation and arrange a preliminary assessment. Clarify questions about the procedure and acceptability with Madrid City Council. Elsewhere in the Community of Madrid, consult the relevant local council.

Frequently asked questions

Is there one minimum floor area for every accessible toilet?

No. The fittings and spaces needed to use them must fit within a layout that meets the applicable requirements.

Are small commercial premises automatically exempt?

Size alone does not establish an exemption. The business activity, use and proposed work must be assessed.

Is installing a sliding door enough?

No. Clear opening width, operation, manoeuvring spaces and the full access route must also be checked.

Can customers and staff share the same toilet?

This depends on the rules governing the activity and the particular circumstances. It is not a universally acceptable solution.

Can I use this sketch to submit a declaración responsable?

A preliminary self-assessment does not replace the required technical and administrative documentation.

Official sources consulted

Need this service? See our Bathroom Renovations in Madrid page.