Energy performance is becoming more than a question of utility bills or building maintenance. For hotel owners, operators and property investors, it is increasingly relevant to capital expenditure planning, refurbishment cycles and the long-term technical strategy of the asset.

Directive (EU) 2024/1275 on the energy performance of buildings, commonly referred to as the recast Energy Performance of Buildings Directive or EPBD, establishes a new European framework intended to move the EU building stock towards zero emissions by 2050.

Hotels are relevant to this framework because they fall within the non-residential building sector for many of the Directive’s provisions.

However, this does not mean that every hotel in Madrid is already required to achieve a particular energy rating or immediately carry out a major energy renovation.

Spain still has to complete important elements of the Directive’s national implementation, including specific thresholds, compliance procedures, exemptions and enforcement arrangements.

For hotel owners and investors, the sensible response is therefore not to rush into unnecessary construction work. It is to understand the technical and energy condition of the building, identify likely future requirements and incorporate them into planned investment decisions.

What does Directive 2024/1275 change for hotels?

One of the most significant measures is the introduction of minimum energy performance standards for existing non-residential buildings, often referred to as MEPS.

Each EU Member State must establish maximum energy-performance thresholds using its national non-residential building stock as it stood on 1 January 2020 as the reference point.

  • The first threshold must be set so that 16% of the national non-residential building stock is above it.
  • A second threshold must be set so that 26% of the national non-residential building stock is above it.
  • From 2030, non-residential buildings must be below the 16% threshold, subject to the exemptions and national implementation permitted by the Directive.
  • From 2033, they must be below the 26% threshold.

The objective is to tackle the worst-performing part of the non-residential building stock first.

For a hotel in Madrid, the important point is that Spain must determine the actual national thresholds. They may be established for the non-residential stock as a whole or differentiated by building type or category.

Until that national framework is fully defined, an owner cannot conclude from the hotel’s energy certificate alone that a particular refurbishment will definitely be compulsory by 2030.

Does every hotel need to reach a specific EPC rating?

No.

The Directive does not establish a single rule requiring every European hotel to move from, for example, an F or G energy rating to a C, B or A rating by 2030.

Member States may relate their thresholds to a particular energy-performance class, provided that the requirements of the Directive are met, but the thresholds can also be expressed through numerical primary or final energy-use indicators, such as kWh/m² per year.

Spain must determine how this system will operate nationally.

This distinction is particularly important for international investors reading information about the EPBD. Requirements discussed in another EU country should not automatically be assumed to apply in exactly the same way to a hotel in Spain.

Similarly, statements such as “all F- and G-rated hotels in Spain must reach a C rating by 2030” should be treated with caution unless they are supported by the final Spanish implementing rules.

Spain is still developing the national framework

The Directive established 29 May 2026 as its general transposition deadline.

On 15 July 2026, the European Commission announced infringement procedures concerning the incomplete transposition of the revised building energy-performance rules across the EU Member States.

In Spain, work has been under way on national measures covering areas including energy-performance certification and minimum standards for existing non-residential buildings.

The Spanish Ministry for the Ecological Transition and the Demographic Challenge — Ministerio para la Transición Ecológica y el Reto Demográfico, or MITECO — has identified several matters that the future national framework needs to define, including:

  • national energy-performance thresholds;
  • how compliance will be demonstrated;
  • the competent authorities;
  • possible exemptions;
  • compliance procedures;
  • and the corresponding enforcement and penalty framework.

This is why hotel owners need to distinguish carefully between the EU Directive, which already establishes the European framework, and the detailed Spanish obligations that will apply to individual buildings.

Why hotels should be treated as non-residential assets

European Commission guidance expressly includes hotels and restaurants among examples of non-residential buildings for the purposes of the minimum energy-performance standards.

This matters because the mechanism for non-residential buildings is different from the EU approach to the residential building stock.

For hotel owners and asset managers, it is therefore more useful to assess the hotel as an individual technical asset than to apply rules or headlines designed primarily for homes and residential property.

The assessment needs to consider how the building is actually used, its installations, energy demand, occupancy patterns, operating hours, refurbishment history and future investment plan.

What should a hotel owner review now?

The first step should normally be to build a reliable technical picture of the property rather than immediately selecting a particular energy-efficiency measure.

Useful information may include:

  • the current Energy Performance Certificate, or EPC;
  • historic energy consumption;
  • usable floor area and building layout;
  • the condition of façades, roofs, windows and other envelope elements;
  • the type and age of heating and cooling systems;
  • domestic hot-water systems;
  • rated output of the building’s technical systems;
  • ventilation systems;
  • lighting and lighting controls;
  • existing building automation or Building Management System, if any;
  • roof condition and available roof area;
  • parking facilities and available electrical capacity;
  • previous refurbishment and maintenance records;
  • and planned bedroom, bathroom or common-area refurbishments.

Once these elements are documented, the hotel can start connecting routine maintenance, planned refurbishments and future energy-performance requirements within a single investment strategy.

Heating, cooling and building automation: a key area for hotels

Heating and cooling can represent an important part of hotel operations because bedrooms, reception areas, restaurants, meeting rooms, corridors and back-of-house spaces can have very different occupancy patterns and thermal requirements.

The Directive strengthens the role of building automation and control systems, normally referred to as BACS.

For non-residential buildings, the European framework provides for qualifying heating, air-conditioning and combined systems to incorporate building automation and control functions where technically and economically feasible.

These systems can be used to:

  • continuously monitor and analyse energy use;
  • record and benchmark building performance;
  • identify losses in system efficiency;
  • detect opportunities to improve performance;
  • provide information to the person responsible for the building;
  • and allow building systems to react more effectively to operating conditions.

For systems with an effective rated output above 70 kW, the Directive establishes a European horizon of 31 December 2029, subject to technical and economic feasibility and national implementation.

Hotels with substantial centralised plant should therefore include this issue within their medium-term technical planning.

If heating or cooling equipment is already due for replacement, it may make more sense to assess the equipment, controls, zoning, service routes and building-management strategy together rather than replacing individual units in isolation.

Maceta y Cortafrío carries out and coordinates heating and air-conditioning work in Madrid as an independent intervention or as part of a wider renovation project, depending on the technical scope required.

Automatic lighting controls also become more relevant

The Directive also introduces requirements concerning automatic lighting controls in certain non-residential buildings.

Different deadlines apply depending on the effective rated output of the building’s technical systems, including European milestones at the end of 2027 and 2029, subject to the conditions laid down in the Directive and its national implementation.

In a hotel, lighting-control strategies may be relevant to:

  • guest rooms;
  • corridors;
  • car parks;
  • meeting and conference rooms;
  • common areas;
  • toilets;
  • storage rooms;
  • staff areas;
  • and spaces with variable occupancy.

This should not be understood simply as installing occupancy sensors throughout a hotel.

The wider direction of the European framework is towards more intelligent building operation, where lighting, heating, cooling and other technical systems can respond more effectively to actual building use.

Why the roof can become a strategic refurbishment decision

The revised EPBD also establishes a progressive framework for the deployment of solar energy on buildings.

For certain existing non-residential buildings with a useful floor area above 500 m², the Directive includes a 31 December 2027 milestone where the building undergoes a major renovation or certain works requiring administrative authorisation, subject to technical, economic and functional suitability and national implementation.

For hotel owners, this can make roof planning particularly important.

A hotel that is already considering:

  • roof waterproofing;
  • replacement of roof finishes;
  • new heating or cooling plant;
  • service installations;
  • or other substantial roof works

may benefit from considering the building’s longer-term solar and technical strategy before those works are finalised.

The purpose is not to install photovoltaic panels simply because a roof is being refurbished. The purpose is to avoid completing one investment and then unnecessarily reopening or altering the same construction area shortly afterwards.

Car parks and electric-vehicle charging

Electric mobility is another area covered by the Directive.

Depending on the number of parking spaces, the type of building, whether the building is new or existing and whether a major renovation is being undertaken, requirements may concern:

  • electric-vehicle charging points;
  • pre-cabling;
  • ducting for future charging infrastructure;
  • smart or managed charging;
  • and bicycle parking.

For existing non-residential buildings with more than 20 parking spaces, the Directive also establishes requirements linked to a 1 January 2027 European milestone, although the exact application to an individual hotel must be assessed against the Directive and the Spanish implementing framework.

A hotel planning to refurbish its car park or substantially modify its electrical installation should therefore consider future charging infrastructure before closing ceilings, floors, service routes or electrical-distribution designs.

Energy upgrades and hotel refurbishment should not be planned separately

Hotels already operate on refurbishment cycles.

Bedrooms, bathrooms, corridors, reception areas, restaurants, meeting spaces, kitchens, technical plant and finishes are renewed at different points in the life of the asset.

If these interventions are planned without considering the building’s future energy strategy, the owner may end up paying for work twice.

Typical examples include:

  • opening suspended ceilings during bedroom refurbishment and reopening them later to alter services;
  • refurbishing a roof without considering future solar or plant requirements;
  • replacing heating or cooling equipment without reviewing controls and zoning;
  • renovating a car park without preparing for future electrical infrastructure;
  • or installing expensive finishes before resolving building-envelope defects.

Where the scope justifies it, several interventions can be coordinated within a full renovation project or within a planned programme of phased works.

The aim is not necessarily to carry out more work. It is to make sure that today’s construction decisions do not create unnecessary cost or disruption in a later phase.

One major renovation or a phased investment programme?

Not every hotel can or should undertake a major renovation in a single construction programme.

The Directive also introduces the concept of a renovation passport: a roadmap designed to guide a building through a sequence of coordinated renovation measures towards deeper energy improvement.

Its practical implementation is a matter for the Member States and forms part of the wider national implementation process.

For hospitality assets, however, the underlying principle is particularly relevant because energy improvements can be aligned with several CAPEX cycles.

A possible sequence might consider:

  • Phase 1: energy and technical assessment, documentation and asset data.
  • Phase 2: controls, automation and lighting.
  • Phase 3: heating, cooling and thermal-generation systems.
  • Phase 4: roof, building envelope and solar measures where appropriate.
  • Phase 5: car park, charging infrastructure and associated electrical works.
  • Phase 6: bedrooms and common areas coordinated with the previous technical interventions.

This sequence is only an example. The correct order depends on the individual hotel, condition of the building, operating model and technical dependencies between the works.

How can refurbishment be coordinated with hotel operations?

For an operating hotel, construction strategy cannot be separated from business continuity.

Noise, dust, electrical shutdowns, heating and cooling interruptions, waste removal, contractor access, guest circulation and fire-safety arrangements can all influence how the work needs to be organised.

Depending on the building and the project, options can include:

  • working floor by floor;
  • creating physically separated work zones;
  • concentrating disruptive work during lower-occupancy periods;
  • scheduling planned service shutdowns outside critical operating hours;
  • grouping demolition and high-noise work into defined periods;
  • or combining a temporary closure of one area with lower-impact works elsewhere.

Phasing is not automatically the cheapest solution.

Although it may reduce the number of rooms taken out of service at the same time, phased construction can also increase temporary protection, mobilisation, cleaning, temporary services and the total programme duration.

The same principles apply to other operating commercial properties. Our guide to renovating commercial premises while open or closed explains the operational trade-offs in more detail.

What should an investor review before acquiring a hotel in Madrid?

For a buyer, energy performance can form part of the asset’s technical due diligence.

Technical due diligence is the investigation of the physical and technical condition of a property before or during an investment transaction. It does not replace legal, planning, financial or commercial due diligence.

For a hotel, it may be useful to review:

  • the Energy Performance Certificate;
  • several years of energy consumption;
  • age and condition of heating and cooling plant;
  • rated system capacity;
  • building-envelope condition;
  • maintenance history;
  • existing BMS or building automation;
  • electrical capacity;
  • roof condition and potential future technical uses;
  • car-parking facilities;
  • planned refurbishment cycles;
  • and estimated technical CAPEX over the following years.

CAPEX means capital expenditure: investment in acquiring, replacing or improving long-term assets and building systems.

A weaker energy-performing hotel should not automatically be considered a poor investment. Location, purchase price, planning potential, operating model, brand strategy, physical condition and repositioning opportunities all matter.

The key issue is whether the likely future technical investment has been identified and reflected in the acquisition model.

International buyers considering refurbishment-led investment in Madrid may also find our property renovation guide for investors useful when assessing construction scope and renovation strategy.

What are the risks of waiting until the last moment?

The immediate risk should not be reduced to the idea of a future fine.

Spain still needs to complete important elements of the implementation framework, including how the minimum standards will be verified and what national enforcement arrangements will apply.

The more immediate business risk is losing the ability to plan effectively.

Waiting until all requirements are fully defined may contribute to:

  • concentrating significant CAPEX into a short period;
  • having to undertake technically urgent work;
  • taking more rooms out of service at the same time;
  • duplicating work already completed during earlier refurbishments;
  • having less time to compare technical alternatives;
  • and underestimating future expenditure during an acquisition.

Planning ahead does not mean carrying out construction before it is justified.

It means collecting enough information to make today’s maintenance, refurbishment and investment decisions compatible with the likely direction of future regulation.

A practical roadmap for a hotel in Madrid

1. Document the current condition

Gather energy certificates, consumption data, existing drawings, technical projects, maintenance records and information on the main building systems.

2. Identify the systems with the greatest operational impact

Review heating, cooling, domestic hot water, ventilation, lighting, building envelope, automation and other significant energy uses.

3. Confirm the rated output of technical systems

The capacity thresholds contained in the Directive can be relevant to building automation, controls and other technical requirements.

4. Align maintenance with future refurbishment

Equipment approaching the end of its useful life should be considered alongside planned bedroom, bathroom, common-area, roof or service upgrades.

5. Develop investment scenarios towards 2030 and 2033

This does not require committing to a fixed construction budget today. It means establishing possible interventions, dependencies and decision points.

6. Update the strategy when Spain finalises the relevant implementing measures

The Spanish framework will provide greater certainty on the applicable thresholds, exemptions, verification procedures and obligations for individual non-residential buildings.

Where Maceta y Cortafrío can fit into a hotel refurbishment project

Energy certification, statutory compliance assessments and technical projects requiring professional sign-off must be undertaken by the appropriately qualified and legally authorised professionals.

Maceta y Cortafrío can assess, execute and coordinate construction and refurbishment works that fall within the company’s services when they form part of a properly defined project.

Depending on the scope, these works may include:

  • controlled demolition and strip-out;
  • internal reconfiguration;
  • masonry and drylining;
  • electrical works;
  • plumbing and drainage;
  • heating and air conditioning;
  • suspended ceilings;
  • lighting works within the refurbishment scope;
  • floor and wall finishes;
  • painting;
  • joinery;
  • final finishes;
  • and coordination between different trades and specialist contractors.

For projects that require a technical design, the construction work must be coordinated with the approved project, the relevant technical documentation and the instructions of the appointed professional team.

Our existing commercial renovation service in Madrid illustrates the same approach to trade coordination, installations and operational requirements for business properties.

If you own, operate or are considering acquiring a hotel or other hospitality asset in Madrid, you can contact Maceta y Cortafrío to discuss the construction scope of a planned refurbishment and whether the work could be organised as a complete or phased project.

Frequently asked questions about Directive 2024/1275 and hotels

Will every hotel in Madrid have to be renovated before 2030?

No such general conclusion can currently be made. Spain must establish the national thresholds and detailed compliance framework that will determine how the requirements apply to individual non-residential buildings.

Do F- or G-rated hotels automatically have to reach a C rating?

No. Directive 2024/1275 does not impose that specific rating transition on every hotel. Spain’s final national rules will determine how the non-residential thresholds are expressed and applied.

Does the Directive require solar panels on every hotel?

No. The Directive introduces a phased solar-deployment framework that depends on matters including building type, size, works being undertaken, technical suitability and national implementation. Each hotel must be assessed individually.

Should an owner start refurbishment work now even though Spain is still implementing the Directive?

Not simply because of concern about future regulation. Construction should be justified by the condition of the asset, the investment strategy and the technical project.

What does make sense is to consider the direction of the EPBD whenever substantial refurbishment, heating and cooling replacement, roof work, electrical upgrades or other long-term investments are already being planned.

Who determines whether a hotel complies with future requirements?

Compliance will need to be assessed under the Spanish regulations applicable at the relevant time, using the building’s technical and energy documentation. Where required, suitably qualified architects, engineers, energy assessors or other authorised specialists should be involved.

Conclusion: plan early, but do not renovate without a diagnosis

Directive 2024/1275 establishes a clear direction for Europe’s non-residential building stock: energy performance requirements and the role of technical building systems will become increasingly important during the coming years.

For hotels in Madrid, 2030 should therefore be viewed not only as a regulatory milestone but also as a useful planning horizon for maintenance, heating and cooling, controls, roof works, electrical infrastructure and refurbishment cycles.

The objective is not to renovate too early. It is to avoid making investment decisions today that make tomorrow’s work more disruptive or unnecessarily expensive.

Before committing substantial capital, hotel owners and investors should verify the regulations applicable at that time, assess the actual condition of the building and obtain the appropriate professional advice where technical design, energy certification or legal interpretation is required.

Official sources and further reading

Important: This article is for general information and reflects the European and Spanish public information available as of 29 September 2026. The requirements applicable to an individual hotel depend on the characteristics of the building, the scope of any proposed works and the final Spanish implementation of Directive (EU) 2024/1275. Specific investment, technical or regulatory decisions should be assessed for the individual asset with appropriately qualified advisers where required.